-
NT Middle School, built in 1968
The proposed work involves the construction of an addition to be used as classrooms, the replacement of asphalt pavement and concrete sidewalks, repairs to foundation cracks, exterior walls, and interior walls, replacement of doors, windows, roof drains, floor finishes, ceilings, lockers, lighting, sump pumps, water heaters, plumbing fixtures, hot water pumps and emergency lighting, improvements to the HVAC system, and technology improvements.Scope of Work
Specific Improvements:- New 10-classroom addition
- Technology expansion: new wiring, video projectors and interactive whiteboards
- Security enhancements
- Add A/C to Computer Room and Library
- Replace/reconfigure paving, walks and curbs
- Modify site lighting and controls
Replacement of:- Window system including blinds
- Corridor and athletic lockers
- Finish flooring
- Select ceilings
- Select doors and hardware
- Electrical service switchboard
- Select lighting and controls
- Sump pumps, water heaters, mixing valves and plumbing fixtures
- HVAC equipment including unit vents, air handling units, PTAC units
- Fin tube radiators and cabinet unit heaters; misc. ducts
- HVAC system controls with digital controls
- HVAC hot water pumps
- Emergency Generator and select emergency lighting
Repair of:- Damaged interior walls
- Exterior masonry, concrete panels, and foundations
- Select areas of roof including drains
- Improvements to building Handicap accessibility
- Add assisted listening system
- Renovate toilet rooms for improved accessibility
- Add handicap lift for pool
Addition of:- Gas shut-off valves
- Emergency phone in elevator
- Water service backflow preventer
- Sprinklers at stage
Middle School Exterior Work
[ModuleInstance->Description]
You need at least version 7 of Flash player. Download latest version here!
Middle School Interior Work[ModuleInstance->Description]
You need at least version 7 of Flash player. Download latest version here!
-